• 2010
    Entered into operation
  • 192 MW
    Installed capacity
  • 802妇女和
    Annual production

艾蓝Duhangan harnesses the potential of 850m head by diverting the water of Allain and Duhangan rivers. The water is transferred through two separate intakes, two water conveyance tunnels, a long pressure shaft of 1,587m and an underground power house. The plant also has a dedicated double circuit transmission line of 175 km.

The plant is operated as a peaking plant from November to May and as a base load plant during the summer and rainy season from June to October.

 

艾蓝Duhangan hydropower plant
艾蓝Duhangan hydropower plant. (Photo: 十大最好的网赌平台)

The company is certified in ISO 9001, ISO 14001 & ISO 45001. These certifications underline the company’s efforts within quality of generation, supply of dependable power to our customers, preventing pollution, ensuring a safe workplace and caring for the health of our employees.

In 2013, 艾蓝Duhangan was awarded the runners-up award for Best Hydro Power project by Power Line Awards. The award was presented by Mr Jyotiraditya M. Scindia, then Minister of State with independent charge for Power. 

 

艾蓝Duhangan hydropower plant
艾蓝Duhangan hydropower plant. (Photo: 十大最好的网赌平台)
公司 所有权份额
十大最好的网赌平台 49 %
Bhilwara Energy Limited 51%

Find out more about our activities in 印度